03/21/2004 Adding the Betriebswerk (engine yard)

Trackback URL: http://layout.mixmox.com/1/Betriebswerk_engine_yard


Now that the underground S-Bahn is done I can cover it over with the ground level that will become the main engine yard with turntable and engine roundhouses and a bunch of sidings. I have already added the turntable code to the control program.

Supports were first placed underneath to ensure the plywood will not warp or sag.
Engine yard

This shows the S-bahn station below ground and the new yard level above
Engine yard above the S-Bahn

part of the yard is now screwed in place. Temporary track laid
Engine yard

there will be another sheet of plywood to the right...
Engine yard

continued on 2004-04-24...



Related pages....
Engine yard
Faller 120146 Sand bunker and sanding tower
Roundhouse interior details
Adding the Betriebswerk (engine yard)
Faller coaling station 120147
Engine yard layout
Adding the Betriebswerk (engine yard)
Roundhouse construction
Water crane lamp signal
Roundhouse interior walls
Water tower






Trains: Layout Home | RemoteSign | Newer layout
Other: Genealogy | Wilsnack | Cape Griffon


Photographs are Copyright by Dale Schultz or Debbie Broderick. Images may be saved and or printed for personal use only.