12/09/2001 Central section framing and wiring
I now have the main power leads that will supply the digital Intellibox and booster twisted and bundled together.
All the framing of the central section is complete

The leads were twisted to reduce interference leaking over to feedback lines.

Related pages....
Black curtains
Left area plywood in place
left area benchwork
Central section framing and wiring
Central area construction
Back ramp foundation
Back ramp wired up
My assistant
Branch line track laid
Threaded rod supports
Threaded rod supports
West benchwork
Installing vines


Trains: Layout Home | RemoteSign | BW Lite Intellibox software | Märklin Guide | Crud-B-Gone
Other: Doings | Genealogy | Wilsnack | Cape Griffon | Art | Dale | Blog


Photographs are Copyright by Dale Schultz or Debbie Broderick. Images may be saved and or printed for personal use only.
This page is http://layout.mixmox.com/1/20011209Centralsectionframingandwiring